Product Description
Ford 99-03 7.3L Powerstroke Injector: Brand New (not reman) LONG LEAD injector intended for cylinder #8 on some 99-03 7.3L engines. Stock power level injector. Sold individually with all the latest revisions.
NOTE: This particular injector is solely intended for the #8 cylinder on some engines which came equipped with what's known as a "LONG LEAD" injector installed in that cylinder. If you are unsure what your engine came equipped with or do not want to take the time to check then order DDP ADNEW for the #8 cylinder & the other seven cylinders if needed.
Details:
- Liter: 7.3
- Engine: Powerstroke
- Years: 1999-2003
- Fuel Type: Diesel
- Condition: New
This product has an additional refundable core charge of $75 that must be paid before the product can ship unless you would like to send your core in first.